Power Source: | Electric |
---|---|
Certification: | ISO/Ce |
After-Sales Service Provided: | Engineers Available to Service Machinery Overseas |
Rotation Speed: | 55r/Min |
Delivery Detail: | 3-15days |
Motor: | Electric Motor |
Customization: |
---|
Suppliers with verified business licenses
RFQ:
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 3-10 days if the goods are in stock. Or 30 days , it's depand to quantity.
Q: What is your terms of payment ?
A:
1) T/T 50% deposit, the Balance shall be paid after the goods inspected but before the shipment;
2) If all the cost is less than USD $ 10000, T/T 100% required in advance.
Order Guide
Before you place order to us, please let us know the following information:
Choose the right Model
Confirm your electric power supply ( Voltage, frequency and phase)
Confirm the beveling angel required
Confirm the welding joint required (U, V, Double V or Compound preparation)
Advise your pipe material ( Carbon steel, stainless steel or others)
Other special demands about machine
The spare parts needed
If the pipe wall thickness more than 30mm, inform us in advance (Important)
Suppliers with verified business licenses